Step power cable installation works about

Because of the high voltage cable laying voltage level is relatively high, construction workers need to exercise caution.
When ready to shop on the roadside manhole cable , more than ten thousand volts suspect inadvertently underground high voltage cable causing an explosion , a fireball was coming out flapping body, burn spot , who also burned the clothes are still dying at the hospital utp cable  where she lives disastrous. Hong Kong Labour Department has sent follow-up to understand the causes of accidents . Two workers for the EMSD maintenance workers , though still conscious , serious injuries , and is currently hospitalized in intensive care units when needed hospital . Plug only works include: oil-filled power cable plugs ended production, for installation tank , automatic drainage and signaling devices , etc. . Finally, ground engineering: the best edge connectors, transposition boxes, protection, grounding box installation.
The first is the site transportation , site transport from the warehouse to the point of loading and unloading of  Network Cabinet construction , transportation and engineering materials , including return empty .
 Followed by the local project : local projects including road excavation , tunneling , channel construction.
 Third, laying works include: laying in the middle head production, lift the cover , pipe , school tide, pulling head production.
 Fourth, the two ends of the project include: support , frame and suspension bridge fabrication and installation of its foundation , the terminal head production, installation of oil pressure and signaling devices , were kind of electrical performance testing.